CHRIST THE REDEEMER CHURCH 

PROJECT INFORMATION:Project: Christ the Redeemer Church
Location: Point Vedra Beach, Florida
Owner: Christ the Redeemer Church
Construction Cost: $5.1 Million
Project Size: 23,000 SF
Completion: August 2007Perry-McCall Construction was hired by Christ the Redeemer Church to help them in designing and constructed a new Family Center and Narthax, or gathering area.

Working with our design consultants and the stakeholders at the church, we evaluated building systems, finishes, and architectural siting, to ensure that the program was achieved, which includes plans for a future 1,400 worship hall.

The structural steel and metal framed building wrapped in a stucco veneer and a modified bituminous roof over vented metal deck. The new Narthax, or gathering area ties the existing worship center to the new Family Center as well as provides a bridge to the future worship hall. The project was undertaken while the main church was in full operation and our team worked closely with church staff to ensure that their daily mission was never impacted by our construction activities.

Share This